Enter the slab length and width in feet and inches, pick a thickness by what the slab is for or type your own, and get the concrete in cubic yards, a ready-mix order rounded up to the quarter yard, the bag count for 80, 60, 50 or 40 lb mix, and a control-joint spacing. Patios, shed pads, garage floors, driveways, equipment pads and any other rectangular slab on the ground. Free, no signup, printable.
A slab takes length times width in feet, times thickness in inches, divided by 324, in cubic yards. A 10 × 10 ft pad at 4 in is 10 × 10 × 4 ÷ 324 = 1.23 cubic yards in the ground; with the 10 percent waste the tool defaults to you buy 1.36 cubic yards, a ready-mix order of 1.5, or 62 bags of 80 lb mix. One cubic yard covers about 81 sq ft at 4 in thick.
The thickness presets are trade practice for each use; the only residential code minimum is 3½ in for a floor slab, IRC 2021 R506.1, quoted with the base and vapor-retarder rules below. The tool does not size a footing, lay out rebar or estimate anything but quantity. For a round pad, steps or a mixed job use the concrete calculator; for a thickened edge the concrete footing calculator; for the stone under the slab the gravel calculator.
How to use this concrete slab calculator
Length and width accept feet and inches, so 12 ft 6 in can be typed as 12′ 6″ or as 12.5. Thickness by use lists four presets: 4 in for a patio, walkway or shed pad; 5 in for a driveway carrying passenger cars; 6 in for a garage floor, a heavy driveway or an RV pad; 8 in for a workshop or equipment pad. They are the thicknesses the trade pours for those jobs, not code figures, and the section on thickness explains where each one comes from. Choose Custom thickness and a thickness field appears, in half-inch steps from 1 to 24 in. Pick the bag size if you are buying pre-mix, and leave the waste at 10 percent unless you know the subgrade is dead flat.
The headline Concrete needed already includes the waste, and so do the cubic feet and cubic metres rows. The ready-mix order line takes that waste-inclusive volume and rounds it up to the next quarter yard, the step a plant batches in; it only appears once the pour reaches half a yard, because nobody sends a truck for an air-conditioner pad. The bag row divides the same volume by the yield printed on the bag and rounds up to a whole bag, so nothing is inflated twice: the default slab shows 1.36 cubic yards, an order of 1.5, and 62 bags of 80 lb, or 82, 98 and 123 at 60, 50 and 40 lb. Slab area and the thickness used are printed so you can check the arithmetic, and the control-joint spacing line applies the trade rule of thumb described further down. Every result prints with its assumptions and saves as a PDF; how every figure on this site is checked is on the methodology page.
What the calculator warns you about
One thing. A thickness under 3½ in trips a warning that the slab is thinner than the IRC 2021 R506.1 minimum for a concrete floor on the ground. The warning does not change the volume; it tells you the slab you typed would not pass as a floor. There is no warning for a thick slab, because the code sets no maximum, and none for the presets, because all four clear the minimum.
How to figure concrete for a slab: the formula with the arithmetic printed
Concrete is sold by the cubic yard and a cubic yard is 27 cubic feet. The tool converts each dimension to feet, multiplies, and divides by 27; the shortcut for a slab folds the inch-to-foot conversion into the divisor, because 12 × 27 = 324. Length in feet times width in feet times thickness in inches, divided by 324, is cubic yards. The 10 × 10 ft slab at 4 in is 400 ÷ 324 = 1.23 cubic yards, which is 33.33 cubic feet. Add 10 percent for waste and it is 1.36 cubic yards, 36.67 cubic feet.
Keep the thickness as a fraction of a foot with all its decimals, or use 324 and skip the conversion. Rounding 4 in to 0.33 ft undercounts by 1 percent, and on a 24 × 24 slab that is the difference between 7.04 and 7.11 cubic yards, a number that shows up on job-site blogs both ways. The project-by-project version of this arithmetic, patio, driveway and pad prep included, is in how to figure concrete for a slab, pad, patio or driveway; the general walkthrough for every shape is how to estimate concrete in cubic yards.
| Row on screen | What it is | Waste applied? |
|---|---|---|
| Concrete needed | Cubic yards, the headline | Yes |
| Ready-mix order (¼ yd steps) | The headline rounded up to the next quarter yard; shown from 0.5 cu yd | Already in the headline |
| Bags | Waste-inclusive cubic feet ÷ yield per bag, rounded up to a whole bag | Already in the volume |
| Cubic feet | Length × width × thickness in feet | Yes |
| Cubic metres | Cubic feet × 0.0283 | Yes |
| Slab area | Length × width in square feet | No |
| Thickness used | The preset or your custom figure, in inches | No |
| Control-joint spacing | About 2½ × thickness, in feet, capped at 15 ft; a trade rule | No |
Bag yields are the manufacturer label values for standard concrete mix: 0.60 cubic feet from an 80 lb bag, 0.45 from 60 lb, 0.375 from 50 lb and 0.30 from 40 lb, which is 45, 60, 72 and 90 bags to the yard. Fast-setting and high-strength blends print their own yield, so read the bag. Bags are always rounded up, never quoted as a fraction. The quarter-yard rounding on the order line is the supplier side of the same question; the concrete yards calculator works the truck order, short loads and minimums, and bagged concrete vs ready-mix walks the break-even by volume.
How many square feet does a yard of concrete cover? (coverage by thickness)
One cubic yard spread at a given thickness covers 324 divided by the thickness in inches, in square feet: 27 cubic feet is 324 inch-square-feet, and dividing by the thickness leaves the area. At 4 in that is 81 sq ft, which is why the trade divides square footage by 81 to get yards for a 4 in slab. The table runs the same division for the thicknesses people actually pour, and adds the 80 lb bag count and the weight of the slab per square foot, at the 150 lb per cubic foot density of normal-weight concrete. The weight is a typical figure, not a code value; a lightweight or heavily air-entrained mix weighs less.
| Thickness | Sq ft per cubic yard | Cubic yards per 100 sq ft | 80 lb bags per 100 sq ft | Slab weight, lb per sq ft |
|---|---|---|---|---|
| 3 in | 108 | 0.93 | 42 | 37.5 |
| 3.5 in | 92.6 | 1.08 | 49 | 43.8 |
| 4 in | 81 | 1.23 | 56 | 50 |
| 5 in | 64.8 | 1.54 | 70 | 62.5 |
| 6 in | 54 | 1.85 | 84 | 75 |
| 8 in | 40.5 | 2.47 | 112 | 100 |
Sq ft per yard = 324 ÷ thickness in inches. Cubic yards per 100 sq ft = 100 × thickness ÷ 324. Bags = cubic feet ÷ 0.60, rounded up. Weight = 150 lb per cu ft × thickness in feet.
Read it either way. A 9 × 9 ft pad at 4 in is one yard exactly, the easiest mental picture of the quantity; a patio of 300 sq ft at 4 in is 300 ÷ 81 = 3.7 yards before waste. Going from 4 in to 6 in takes the coverage from 81 to 54 sq ft, so the same yard does two-thirds of the area and the same slab takes half again as much concrete. The reverse conversion, from yards on the truck ticket back to the square feet they will cover at your thickness, is a one-line job on the concrete yards calculator.
Concrete for common slab sizes, at 4 and 6 inches
These are the slab sizes people ask about by name, run through the same formula at the two thicknesses that cover most residential work. The 4 in columns give the concrete in the ground, the same figure with the tool's 10 percent waste, and the 80 lb bag count from that waste-inclusive volume; the 6 in columns give the volume with and without waste. Every cell is regenerated from the formula when this page is built, and rounding on the bags is always up.
| Slab | Sq ft | 4 in, cu yd | 4 in + 10 % | 80 lb bags at 4 in | 6 in, cu yd | 6 in + 10 % |
|---|---|---|---|---|---|---|
| 8 × 8 ft | 64 | 0.79 | 0.87 | 40 | 1.19 | 1.3 |
| 10 × 10 ft | 100 | 1.23 | 1.36 | 62 | 1.85 | 2.04 |
| 10 × 12 ft | 120 | 1.48 | 1.63 | 74 | 2.22 | 2.44 |
| 12 × 12 ft | 144 | 1.78 | 1.96 | 88 | 2.67 | 2.93 |
| 12 × 16 ft | 192 | 2.37 | 2.61 | 118 | 3.56 | 3.91 |
| 16 × 20 ft | 320 | 3.95 | 4.35 | 196 | 5.93 | 6.52 |
| 20 × 20 ft | 400 | 4.94 | 5.43 | 245 | 7.41 | 8.15 |
| 20 × 24 ft | 480 | 5.93 | 6.52 | 294 | 8.89 | 9.78 |
| 24 × 24 ft | 576 | 7.11 | 7.82 | 352 | 10.67 | 11.73 |
| 24 × 30 ft | 720 | 8.89 | 9.78 | 440 | 13.33 | 14.67 |
| 30 × 30 ft | 900 | 11.11 | 12.22 | 550 | 16.67 | 18.33 |
| 30 × 40 ft | 1200 | 14.81 | 16.3 | 734 | 22.22 | 24.44 |
Two of these rows are the ones that go wrong on other calculator pages. A 10 × 10 at 4 in with 10 percent waste is 36.67 cubic feet, which is 62 bags of 80 lb once you round up; a page that prints 61 has rounded down, and one bag short is one bag short. A 12 × 12 at the same thickness is 88 bags, because 52.8 cubic feet divides into 0.60 exactly. The 24 × 24 row is 7.11 cubic yards, not the 7.04 you get from 0.33 ft. The 10 × 10 question in full, at every thickness and bag size, lives on the concrete calculator page; the areas themselves, for any dimension pair, are in how many square feet is 12x12, 10x10, 20x20.
How thick should a concrete slab be? Code minimum versus trade practice
There is one code number and a set of trade numbers, and the two get mixed up constantly. The code number is 3½ in: IRC 2021 R506.1 says a concrete floor on the ground shall be that thick at minimum, and says nothing about patios, driveways or pads at all, because they are not floors of a dwelling. Everything above 3½ in is practice: what contractors pour for a given load and subgrade, what a supplier will quote, what your inspector expects to see. The presets in the calculator are those trade figures, and the table says why each one is what it is.
| Use | Thickness | Why | Page |
|---|---|---|---|
| Any concrete floor on the ground | 3½ in | IRC 2021 R506.1 minimum, the only code floor | This page |
| Patio, walkway or shed pad | 4 in | First half-inch above the minimum that a 2×4 form gives you; foot traffic and garden equipment | Patio, sidewalk, shed base |
| Interior floor, basement, utility room | 4 in | Trade default; R506.1 sets the floor at 3½ in | This page |
| Driveway, passenger cars | 5 in | Wheel loads and edge loading from the street; many pours are 4 in with the edges thickened | Driveway calculator |
| Garage floor, heavy driveway, RV or boat pad | 6 in | Pickup and trailer axle loads; garage floors also change the concrete strength in Table R402.2 | This page |
| Workshop or equipment pad with a lift or machinery | 6 to 8 in | Point loads under posts and legs; usually with rebar | This page |
| Anything over 8 in, or a slab carrying a structure | Engineered | Outside the prescriptive path; R506.1 also points expansive soils to R403.1.8 | Code guide |
Thickness is the one input that moves the volume in a straight line, so the decision adds exactly what it looks like. A 20 × 20 ft slab is 4.94 cubic yards at 4 in, 6.17 at 5 in and 7.41 at 6 in: a quarter more for the extra inch, half again for two. On a bag job the jump is starker, because the 62 bags for a 10 × 10 at 4 in become 92 at 6 in.
What the extra inches do not do is fix the ground. The threads where garage owners argue 4 against 6 in end the same way each time: a 6 in slab on loose fill cracks before a 4 in slab on compacted base does, because the subgrade carries the load and the concrete only spreads it. If the choice is between two more inches of concrete and a compacted base with the topsoil stripped, take the base, and read the R506.2 site preparation rules before the thickness argument. A garage floor changes one other thing: Table R402.2 raises the concrete strength for garage floors and exterior flatwork in moderate and severe weathering, which is a mix question for the plant rather than a thickness question for the form.
Why the pour takes more concrete than the formula says
The formula is exact for the slab on the drawing. The pour is a slab on the ground, and four things about the ground change the volume in ways the length-times-width arithmetic never sees. Each one has a number.
- A 4 in slab formed with a 2×4 is 3½ in. A 2×4 measures 3½ in, the lumber actual size chart being the standing surprise, so a slab screeded flush with the top of the form is a 3½ in slab. A 10 × 10 at 3½ in is 1.08 cubic yards against 1.23 at a true 4 in, 12.5 percent less. That is one reason a 4 in order comes back with a wheelbarrow to spare, and one reason a slab that was meant to be 4 in reads thinner when it is cored. The actual size of a 2x4 covers the dressed sizes for every form board.
- The subgrade is never at plan grade. Half an inch low across the pour turns a 4 in slab into a 4½ in slab, plus 12.5 percent. On a 30 × 40 shop floor that is 14.81 cubic yards on paper and 16.67 in the ground, and the garage owner who ordered 20 yards and placed 21½ was not bad at arithmetic; his grade was low. This is what the waste field covers, and it is why the default is 10 rather than 5 percent.
- A sloped slab is thicker than its thin edge. Garage floors fall toward the door, patios and walks fall away from the house. The IRC sets a slope for flatwork near a foundation, R401.3 in the exception: Impervious surfaces within 10 feet (3048 mm) of the building foundation shall be sloped not less than 2 percent away from the building, which is a quarter inch per foot. Hold the top of the slab level with the forms and let the slope come from the grade, and the slab thickens as it goes. A 24 ft garage floor at ¼ in per foot drops 6 in, so a 4 in slab at the door is 10 in at the back wall and averages 7 in; that is 12.44 cubic yards for a 24 × 24, not 7.11. Enter the average thickness as a custom value, or grade the base to the same slope and keep the slab uniform.
- Waste is not compaction. Gravel is ordered loose and compacts by roughly a fifth, a figure that comes up in every base thread, and people carry the idea across: does the concrete pack down too? No. Concrete is a fluid that fills the form and cures at the volume it was placed; a yard on the ticket is a yard in the slab. The waste percentage covers spillage, the low subgrade and the bowing form, nothing else, and it applies to what you buy, never to the area you measured.
| Effect | Thickness change | Volume change | Where to fix it |
|---|---|---|---|
| Screeding flush with a 2×4 form | 3½ in instead of 4 | −12.5 % | Set the form on a strip, or order for 4 in and expect some left over |
| Subgrade ½ in low across the pour | 4½ in instead of 4 | +12.5 % | Shoot the grade with a level before ordering; that is what the waste is for |
| Floor sloped ¼ in per foot over 24 ft | Average 7 in on a 4 in edge | +75 % | Use the average thickness in the calculator, not the edge |
| Thickened edge or turndown around a 12 × 16 | 12 × 12 in trench, 56 ft | +2.07 cu yd | Footing calculator |
| Wheelbarrow, chute and pump line | — | A few percent | Inside the 10 percent waste |
IRC 2021 R506: what the code requires under and in a slab on ground, verbatim
Section R506 is one page of the residential code, page 5-28 of the Chapter 5 PDF of the 2021 Seattle Residential Code, which reprints the IRC text with no local amendment in any line quoted here; the strength table and the slope rule are on pages 4-2 and 4-1 of the Chapter 4 PDF. It covers thickness, what goes under the slab, and where reinforcement sits. It does not cover control joints, rebar spacing or how thick a patio should be, and a page that tells you it does is quoting something else.
| Item | Section | Page | What it says |
|---|---|---|---|
| Concrete floor on the ground, minimum thickness | R506.1 | 5-28 | 3½ in; expansive soils go to R403.1.8; strength per R402.2 |
| Site preparation | R506.2 | 5-28 | Vegetation, topsoil and foreign material removed inside the foundation walls |
| Fill under the slab | R506.2.1 | 5-28 | Compacted; not over 24 in of clean sand or gravel, 8 in of earth, unless approved |
| Base course | R506.2.2 | 5-28 | 4 in of clean graded sand, gravel, crushed stone, crushed concrete or slag, passing a 2 in sieve, where the slab is below grade; not required on well-drained Group I soils |
| Vapor retarder | R506.2.3 | 5-28 | 10-mil, ASTM E1745 Class A, joints lapped 6 in; not required for garages, unheated accessory buildings, storage rooms under 70 sq ft, carports, driveways, walks, patios and other flatwork |
| Reinforcement, where provided | R506.2.4 | 5-28 | Supported to stay from the centre to the upper third of the slab during the pour |
| Strength, interior slabs on grade | Table R402.2 | 4-2 | 2,500 psi at 28 days in every weathering zone |
| Strength, garage floors, porches, carport slabs, steps | Table R402.2 | 4-2 | 2,500 psi negligible; 3,000 psi moderate; 3,500 psi severe; air-entrained 5 to 7 percent in moderate and severe |
| Slope of flatwork near the foundation | R401.3, exception | 4-1 | Impervious surfaces within 10 ft of the foundation sloped at least 2 percent away from the building |
| Turned-down footings, Seismic Design Category D0 to D2 | R403.1.3.3 | 4-11 | One No. 4 bar top and bottom of the footing, or one No. 5 or two No. 4 in the middle third |
R506.1, the thickness minimum
Concrete slab-on-ground floors shall be designed and constructed in accordance with the provisions of this section or ACI 332. Floors shall be a minimum 3-1/2 inches (89 mm) thick (for expansive soils, see Section R403.1.8). The specified compressive strength of concrete shall be as set forth in Section R402.2. That is the entire thickness rule for a residential slab. The word is floors: it governs a basement slab, a slab-on-grade house and a garage floor, and it is the reason 4 in became the trade default, since a 2×4 form set on a strip of base gives you 3½ in and change. Nothing in R506 sets a thickness for a patio or a driveway.
R506.2.2, the base course, and the condition people miss
A 4-inch-thick (102 mm) base course consisting of clean graded sand, gravel, crushed stone, crushed concrete or crushed blast-furnace slag passing a 2-inch (51 mm) sieve shall be placed on the prepared subgrade where the slab is below grade. The condition is in the last five words. The code requires the base where the slab sits below the surrounding grade, and the exception waives it altogether on well-drained Group I soils. A patio poured at grade on clean sandy gravel has no base requirement in the IRC; it usually gets one anyway, because a compacted base is the cheapest insurance against the low-subgrade problem above. The base is a separate order, sold by the ton and compacted in place; the gravel calculator sizes it, and how much gravel do I need works the depths by job.
R506.2.3, the vapor retarder and its four exceptions
A minimum 10-mil (0.010 inch; 0.254 mm) vapor retarder conforming to ASTM E1745 Class A requirements with joints lapped not less than 6 inches (152 mm) shall be placed between the concrete floor slab and the base course or the prepared subgrade where a base course does not exist. The exceptions are the list most slab jobs fall into: 1. Garages, utility buildings and other unheated accessory structures. 2. For unheated storage rooms having an area of less than 70 square feet (6.5 m²) and carports. 3. Driveways, walks, patios and other flatwork not likely to be enclosed and heated at a later date. 4. Where approved by the building official, based on local site conditions. Read exception 3 carefully before you skip the sheet under a shed pad: a shed you might later insulate and heat is not flatwork.
Table R402.2, the strength the plant will ask for
An interior slab or a basement floor needs 2,500 psi at 28 days in every weathering zone. A garage floor, a porch, a carport slab or exterior steps needs 3,000 psi where the weathering potential in Table R301.2 is moderate and 3,500 psi where it is severe, air-entrained at 5 to 7 percent; note f lets a steel-troweled garage floor drop to 3 percent air if the mix is raised to 4,000 psi. Weathering potential is a map figure your jurisdiction fills into Table R301.2. When you phone the order in, this is the number the dispatcher is asking for; the mix proportions behind it are in concrete mix ratios, water and PSI. The full walk through R403 and R506 together, footing and slab, is the concrete footing and slab code guide.
Control joints, gravel base and thickened edges: what the tool leaves to you
Control-joint spacing, a trade rule the IRC does not set
The calculator prints a joint spacing of about 2½ times the slab thickness in inches, as feet, rounded to the half foot and capped at 15 ft: 10 ft for a 4 in slab, 12.5 ft for 5 in, 15 ft for 6 in and above. That is the middle of the 2-to-3-times rule of thumb from the flatwork side of the trade, and it is labelled as such on the result because the residential code has no joint-spacing provision for slabs on grade at all. Joints are cut or tooled to a quarter of the slab depth, 1 in on a 4 in slab, as early as the surface will take a blade without ravelling, usually the next morning. A 20 × 24 ft slab at 4 in on 10 ft spacing takes one joint across the 20 ft direction and two across the 24, six panels near 10 × 8 ft. Keep the panels close to square; a long thin panel cracks across the middle no matter where the joints are.
Rebar and mesh do not remove the need for joints in practice; they hold a crack tight once it forms, and a joint decides where it forms. The garage owner who skipped joints on a 5 to 8 in slab with half-inch bar at 12 in each way was relying on thickness and steel to hide the cracks, which is a choice, not a code position. R506.2.4 has the one thing the IRC does say about reinforcement in a slab: where you use it, keep it supported from the centre to the upper third of the slab while you pour, which is where it does its work, not lying on the base where a mesh ends up when it is hooked up by hand.
Gravel base: a second order, in tons, that compacts
The base under the slab is not in the concrete figure and should not be. It is ordered loose by the ton, spread, and compacted to about four-fifths of its loose depth, so 4 in of compacted base needs closer to 5 in of loose stone. A 30 × 40 shop floor on 4 in of compacted base is 1,200 ÷ 81 = 14.8 cubic yards compacted and around 18½ loose, which at the 1¼ tons per loose yard suppliers commonly quote is a bigger delivery than most people picture. Whether the code requires it is the R506.2.2 condition above; whether you want it is a different question with the same answer. The gravel calculator does the tons; this page does not.
Thickened edges and monolithic slabs
A slab with a turned-down edge is a slab plus a footing, and the footing is often the surprise in the total. A 12 × 16 ft shed slab with a 12 in wide, 12 in deep turndown around the edge has 2 × (12 + 16) = 56 ft of trench at one square foot of section, 56 cubic feet or 2.07 cubic yards on top of the 2.37 the flat slab takes at 4 in, which nearly doubles the order. Enter the slab here and the turndown in the concrete footing calculator, which also reads the footing width from IRC Table R403.1; the depth and volume questions for footings and posts are gathered in concrete for footings and posts. In Seismic Design Category D0, D1 or D2, R403.1.3.3 puts a No. 4 bar top and bottom of a turned-down footing; elsewhere the reinforcement is the designer's call.
Concrete pad calculator: air-conditioner, generator, hot tub and shed pads
A concrete pad is a slab. The word tends to mean a small isolated one, an equipment base rather than a floor, but the arithmetic, the code section and the tool are the same, so the calculator above is the concrete pad calculator too. The sizes below are typical for each job and are the starting point, not the specification: the equipment manufacturer's installation sheet gives the pad size and often the thickness, and a hot tub dealer will hand you a loaded weight that decides whether 4 in or 6 in is enough. A pad that will carry a heated structure is a floor under R506, and the vapor-retarder exception for flatwork stops applying.
| Pad | Typical size | Concrete, cu yd | 80 lb bags | Ready-mix order |
|---|---|---|---|---|
| Air-conditioner condenser pad | 3 × 3 ft × 4 in | 0.12 | 6 | no truck line |
| Standby generator pad | 3 × 5 ft × 4 in | 0.2 | 10 | no truck line |
| Hot tub pad | 8 × 8 ft × 6 in | 1.3 | 59 | 1.5 |
| Shed pad, 10 × 12 shed | 11 × 13 ft × 4 in | 1.94 | 88 | 2 |
The first two rows are bag jobs and the tool says so by leaving the order line off: an air-conditioner pad is 6 bags, mixed in a barrow in an hour. The hot tub pad crosses into truck territory at 6 in, and a shed pad sized 6 in past the shed walls on each side, an 11 × 13 pad for a 10 × 12 shed, is nearly two yards with waste, which is the point at which mixing 88 bags by hand stops being a weekend. The shed base calculator takes the shed size and adds the overhang and the base for you.
Which concrete calculator do you need?
Every tool in the concrete section runs the volume arithmetic on this page; each adds the input its job turns on. Use this one when the job is a rectangular slab and the question is thickness; move across when the shape, the footing or the order is the question.
| Job | Use | What it adds |
|---|---|---|
| One rectangular slab or pad, thickness by use | This page | Presets, joint spacing, bag count, quarter-yard order |
| Round pad, steps, curb, or several shapes on one job | Concrete calculator | Six shapes with a quantity field and the bag table for every size |
| You buy bags and want the count first | Bags of concrete calculator | Bag count as the headline, bags per yard for every size |
| You are calling a plant | Concrete yards calculator | Truck loads, short-load thresholds, yards back to square feet |
| Thickened edge, turndown or continuous footing | Concrete footing calculator | Perimeter mode; footing width from IRC Table R403.1 |
| Fence or deck posts | Post hole concrete calculator | Subtracts the post at its actual dressed size |
| Stone under the slab | Gravel calculator | Cubic yards and tons from a depth, compaction included |
| Rebar or mesh for the slab | Rebar calculator | Bar count, length and weight from a grid spacing |
| Deck pier size from the load | Deck footing size calculator | Footing size from tributary area and soil bearing |
| Driveway, patio, sidewalk or shed base | Driveway, patio, sidewalk, shed base | Thickness by vehicle, fall, panel layout, overhang |
Concrete slab questions from forums and job sites
How do I figure concrete for a slab?
Multiply the length by the width in feet, multiply by the thickness in inches, and divide by 324 for cubic yards; or convert everything to feet, multiply, and divide by 27. A 12 × 12 ft slab at 4 in is 144 × 4 ÷ 324 = 1.78 cubic yards, 1.96 with 10 percent waste. Do not round the thickness to 0.33 ft; keep the fraction or use 324. Add the waste to the volume before rounding up to the quarter yard or dividing into bags, and add any thickened edge as a separate footing volume. The calculator above does each step and prints them.
How many square feet does a yard of concrete cover?
About 81 square feet at 4 in thick, 108 at 3 in, 65 at 5 in, 54 at 6 in and 40 at 8 in. The figure is 324 divided by the thickness in inches, because a cubic yard is 27 cubic feet and 27 × 12 is 324. Contractors run it backwards for a 4 in slab: square feet divided by 81 gives yards. A 9 × 9 ft pad at 4 in is one yard exactly. None of these include waste, so convert first and add the margin after; the full table by thickness, with bags and weight, is above.
Should I pour a 4-inch or 6-inch slab?
Four inches for a patio, walkway, shed pad or interior floor without vehicles; six for a garage floor, a heavy driveway or an RV pad; five is the usual compromise for a car driveway. The code minimum for a floor is 3½ in, IRC 2021 R506.1, and everything above it is trade practice by load. Six inches is 50 percent more concrete than four, 7.41 against 4.94 cubic yards on a 20 × 20, and it does not compensate for a poor subgrade; a compacted base under 4 in outlasts 6 in on loose fill.
Is a 4-inch slab really 4 inches?
Often not. A 2×4 form board is 3½ in tall, so a slab screeded flush with the top of the form is 3½ in thick unless the form was set on a strip of base or a spacer. The difference is 12.5 percent of the concrete, 1.08 cubic yards instead of 1.23 on a 10 × 10, and it is why a 4 in order on a 2×4 form comes back with some left over. Three and a half inches still meets R506.1 for a floor. If you want a true 4 in, set the forms up half an inch or use a 2×6 form and a screed guide.
Why did my slab take more concrete than the calculator said?
Because the ground was not at plan grade, the floor was sloped, or the edge was thickened. Half an inch of low subgrade across the pour adds 12.5 percent to a 4 in slab; a garage floor falling a quarter inch per foot over 24 ft averages 3 in thicker than its thin edge; a turned-down edge is a footing that was never in the slab arithmetic. Formula results are exact for the slab on paper. Enter the average thickness, add the turndown separately, shoot the grade before you order, and keep the 10 percent waste: it exists for the first two.
How much concrete do I need for a 10x10 slab?
1.23 cubic yards at 4 in, 1.36 with 10 percent waste and 62 bags of 80 lb; the full answer at every thickness and bag size is on the concrete calculator page.
How many yards of concrete for a 24x24 slab?
7.11 cubic yards at 4 in, which is 576 × 4 ÷ 324, or 7.82 with 10 percent waste, an order of 8 at the quarter-yard step. At 6 in it is 10.67 cubic yards. You will see 7.05 quoted for the 4 in slab; that comes from rounding 4 in to 0.33 ft and it is a third of a yard light on a slab this size. A 24 × 24 garage floor that slopes toward the door averages thicker than 4 in, so use the average in the tool, and add the turndown around the edge as a footing if there is one.
Does the IRC require gravel under a concrete slab?
Only where the slab is below grade. R506.2.2 requires a 4 in base of clean graded sand, gravel, crushed stone, crushed concrete or slag passing a 2 in sieve where the slab is below grade, and the exception waives it on well-drained Group I soils. A patio at grade has no base requirement in the code. Most slabs get one anyway, because compacted base is the cheapest defence against a low subgrade, frost heave and standing water, and the trade puts 4 in under patios and 6 in or more under driveways and garage floors. The gravel is a separate order in tons that compacts by about a fifth.
Do I need a vapor barrier under a slab?
Under a floor, yes: R506.2.3 requires a 10-mil vapor retarder to ASTM E1745 Class A with joints lapped 6 in between the slab and the base. Under flatwork, no: the exceptions cover garages and unheated accessory buildings, unheated storage rooms under 70 sq ft, carports, and driveways, walks, patios and other flatwork not likely to be enclosed and heated later. The last clause is the one to read twice. A shed pad or a garage slab you might insulate and heat someday is not flatwork, and the sheet is cheap next to a damp floor you cannot fix from above.
How far apart should control joints be?
Two to three times the slab thickness in inches, as feet: 8 to 12 ft on a 4 in slab, with 10 ft the usual figure and 15 ft the practical ceiling for any thickness. The calculator prints 2½ times the thickness, rounded to the half foot and capped at 15 ft. This is a trade rule of thumb; the IRC sets no joint spacing for residential slabs on grade. Cut or tool the joints to a quarter of the slab depth as soon as the surface takes a blade cleanly, keep the panels near square, and put a joint at any re-entrant corner where a crack would otherwise start.
Does rebar mean I can skip control joints?
In trade practice, no. Reinforcement holds a shrinkage crack tight once it opens; a joint decides where the crack opens so it is straight and hidden. A thick slab with a tight bar grid will crack less visibly without joints, which is why some garage owners skip them and report no problems, but that is a gamble on the subgrade, not a rule. The one thing the IRC does say about reinforcement in a slab on ground is R506.2.4: where you use it, support it so it stays from the centre to the upper third of the slab during the pour.
How much does a concrete slab weigh?
About 150 lb per cubic foot for normal-weight concrete, which is 50 lb per square foot at 4 in, 62½ at 5 in, 75 at 6 in and 100 at 8 in. A 20 × 20 ft garage floor at 6 in is 200 cubic feet and roughly 30,000 lb, 15 tons. The density is a typical figure, not a code value; lightweight and heavily air-entrained mixes weigh less. It matters for a slab on a deck or a rooftop, which is an engineered job, and for hauling bags: a yard of 80 lb bags is 45 sacks and 3,600 lb in the back of a pickup.
What PSI concrete should a garage floor or patio be?
IRC 2021 Table R402.2 sets 2,500 psi at 28 days for basement slabs and interior slabs on grade in every weathering zone. Garage floors, porches, carport slabs and exterior steps go to 3,000 psi where the weathering potential is moderate and 3,500 psi where it is severe, air-entrained at 5 to 7 percent. A patio is exterior flatwork and follows the same moderate or severe column in practice. Weathering potential is the map figure in Table R301.2 for your jurisdiction. The mix proportions and water behind the number are in concrete mix ratios, water and PSI.
How much slope should a patio or driveway slab have?
At least 2 percent away from the house within 10 ft of the foundation, which is IRC 2021 R401.3 in the exception: impervious surfaces within 10 feet of the building foundation shall be sloped not less than 2 percent away from the building. Two percent is a quarter inch per foot, the trade figure for patios, walks and garage floors. Slope adds concrete if the top is graded and the base is flat: a quarter inch per foot over 24 ft is 6 in of extra depth at the far edge, 3 in on average. Grade the base to the same fall and the slab stays uniform.
Is a concrete pad the same as a concrete slab?
Yes. A pad is what people call a small, isolated slab, an air-conditioner base, a generator pad, a hot tub pad or a shed pad, and it is calculated, poured and governed by the same rules as any other slab on ground. Use the calculator above with the pad dimensions; typical sizes are in the pad table. The one distinction that matters is heated or not: a pad under a shed you might later heat is a floor under R506, so the vapor retarder exception for flatwork stops applying, and a hot tub pad usually goes to 6 in for the loaded weight.
How many bags of concrete for a 12x12 slab?
88 bags of 80 lb at 4 in with 10 percent waste, or 80 without; the bag question by shape and size is on the bags of concrete calculator and in how many bags of concrete do I need.
Source and verification of these slab figures
Every volume on this page is length times width times thickness converted to cubic yards, and every worked figure, table cell and bag count is regenerated from the same formula the calculator runs and checked by script against the copy before publishing; if a number here disagrees with the tool, the tool is right and the page has a typo. Bag yields are the manufacturer label values for standard concrete mix. Thickness presets and the control-joint rule are trade practice and are labelled as such. The code text is IRC 2021 R506.1 to R506.2.4, Table R402.2, R401.3 and R403.1.3.3, read from the Chapter 5 and Chapter 4 PDFs of the 2021 Seattle Residential Code, pages 5-28, 4-1, 4-2 and 4-11, which carry no local amendment in the sections quoted. How every figure on this site is checked is on the methodology page; who builds it is on the about page.