Enter a slab, footing or step by length, width and thickness, a round hole or pier by diameter and depth, or a volume you already have in cubic yards or feet, pick the bag size, and get the bag count with waste already inside, rounded up to whole bags. Prints the volume, the cubic yards, bags per cubic yard and a four-size comparison. Free, no signup, printable.
Bags = cubic feet of concrete ÷ the yield printed on the bag, with the waste added first and the result rounded up once. A 10 × 10 ft slab at 4 in is 33.33 cubic feet, 36.67 with the 10 percent waste the tool defaults to, and 36.67 ÷ 0.60 = 61.1, so 62 bags of 80 lb mix, or 82 of 60 lb, 98 of 50 lb, 123 of 40 lb. A cubic yard is 45, 60, 72 or 90 bags by the same four sizes; the per-yard table runs from a quarter yard to three.
The calculator counts bags for one shape at a time and multiplies by how many of them you have. It does not subtract a post from a hole, size a footing or pick a slab thickness: for a fence post or a pier with the post in it use the post hole concrete calculator, for thickness by use the concrete slab calculator, and once the count passes a yard, the truck order is the concrete yards calculator.
How to use this bags of concrete calculator
What are you filling? has three settings. Rectangle takes length and width in feet and inches, so 12 ft 6 in can be typed as 12′ 6″ or 12.5, plus a thickness in inches in half-inch steps, and covers a slab, a pad, a strip footing, a step or a curb. Round hole, pier or column takes the diameter in inches and the depth in feet and inches, and treats the shape as solid concrete: nothing is taken out for a post, a pipe or a tube wall. I already know the volume takes a figure in cubic yards or cubic feet from another calculator, a plan or a plant ticket. In the first two modes How many of these? multiplies the shape, so eight post holes or three steps are one entry.
Waste allowance defaults to 10 percent and is added to the volume before anything is counted, in every mode, including the volume mode; if the figure you type already carries a margin, set the waste to 0 or the margin doubles. The Volume and Cubic yards rows already include it, which is why the default slab prints 36.67 cu ft and 1.36 cu yd rather than 33.33 and 1.23. The bag count divides that waste-inclusive volume by the yield and rounds up once: 62 bags of 80 lb for the default, or 82, 98 and 123 at 60, 50 and 40 lb in the four-size table under the result. Bags each appears when the quantity is above one and is rounded on its own, so four 8 in holes 2 ft deep show 2 bags each and 6 in total, not 8, because 3.07 cu ft of concrete needs 6 bags, and rounding four times would buy two you do not need. Every result prints its assumptions and saves as a PDF; how every figure on this site is checked is on the methodology page.
| Row | What it is | Waste inside? |
|---|---|---|
| 80 lb bags needed | Waste-inclusive cubic feet ÷ the yield of the size you picked, rounded up to a whole bag; the label follows the bag size | Yes, once |
| Volume | Cubic feet of the shape, times the quantity, with the waste added | Yes |
| Cubic yards | The same volume ÷ 27 | Yes |
| 80 lb bags per cubic yard | 27 ÷ yield, rounded up: 45, 60, 72 or 90 | No, a constant |
| Bags each | Only when the quantity is more than one: bags for a single shape, with waste, rounded up on its own | Yes |
| Pre-mix table | Bags, yield and bags per yard for all four sizes at once, from the same waste-inclusive volume | Yes, once |
| One-yard note | Appears when the waste-inclusive volume reaches a cubic yard and names the bag count for a yard of the size you picked | — |
What the calculator warns you about
One thing, in rectangle mode only. A thickness under 3½ in trips a warning that the slab is thinner than the IRC 2021 R506.1 minimum for a concrete floor on the ground, quoted further down. The count is still printed, because a 2 in topping or a step tread is a real job; the warning tells you the slab you typed would not pass as a floor. Round and volume modes warn about nothing, since a pier has no minimum thickness in the tool and a typed volume has no shape.
How much concrete is in a bag? Yield, coverage and water by bag size
A bag of pre-mix is a fixed weight of dry cement, sand and stone; add water and it becomes a fixed volume of concrete, the yield, printed on the bag. Standard concrete mix yields about 0.60 cubic feet from an 80 lb bag, 0.45 from 60 lb, 0.375 from 50 lb and 0.30 from 40 lb, and those four figures are what this calculator divides by. Every one of them is 133 lb of dry mix per cubic foot of concrete, which means a cubic yard of bagged concrete is 3,600 lb of mix whatever size you carry it in. Fast-setting, crack-resistant, high-strength and 90 lb bags print their own yield, so read the bag; a 90 lb bag is roughly two-thirds of a cubic foot and comes to about 41 bags a yard.
| Bag | Yield cu ft | Cubic yards | Sq ft at 2 in | at 3 in | at 4 in | at 6 in | Water to start (label) |
|---|---|---|---|---|---|---|---|
| 80 lb | 0.6 | 0.022 | 3.6 | 2.4 | 1.8 | 1.2 | about 3 qt |
| 60 lb | 0.45 | 0.017 | 2.7 | 1.8 | 1.35 | 0.9 | about 2 qt |
| 50 lb | 0.375 | 0.014 | 2.25 | 1.5 | 1.12 | 0.75 | read the bag |
| 40 lb | 0.3 | 0.011 | 1.8 | 1.2 | 0.9 | 0.6 | about 1½ qt |
Sq ft = yield ÷ thickness in feet. Cubic yards = yield ÷ 27. Water is the starting amount the label lists for standard mix, before adjusting to a stiff, workable consistency; it is the quantity to have on site, not a mixing method.
The square-foot columns are the ones people search for by accident: an 80 lb bag covers 1.8 sq ft at 4 in, 3.6 at 2 in, 1.2 at 6 in, so a 3 × 3 ft pad at 4 in is 9 ÷ 1.8 = 5 bags before waste and 6 with it. Run it backwards and 30 bags of 60 lb make 13.5 cubic feet, exactly half a yard. The water column matters for the same reason the bag count does, because a yard of 80 lb mix wants roughly 34 gallons of water carried to the mixer; the water-cement ratio, slump and what too much water does to strength are on concrete mix ratios, water and PSI.
How many bags of concrete in a cubic yard? 45, 60, 72 or 90, and for a quarter yard to three
A cubic yard is 27 cubic feet, and 27 divided by each label yield lands on a whole number four times over: 27 ÷ 0.60 = 45 bags of 80 lb, 27 ÷ 0.45 = 60 of 60 lb, 27 ÷ 0.375 = 72 of 50 lb, 27 ÷ 0.30 = 90 of 40 lb. The calculator prints the figure for the size you picked as its own row and never rounds it, because there is nothing to round. Those counts are for a yard of concrete in the ground; with the tool's 10 percent waste a yard of purchase is 50, 66, 80 or 99 bags.
| Concrete | Cu ft | 80 lb | 60 lb | 50 lb | 40 lb |
|---|---|---|---|---|---|
| ¼ cu yd | 6.75 | 12 | 15 | 18 | 23 |
| ½ cu yd | 13.5 | 23 | 30 | 36 | 45 |
| ¾ cu yd | 20.25 | 34 | 45 | 54 | 68 |
| 1 cu yd | 27 | 45 | 60 | 72 | 90 |
| 1½ cu yd | 40.5 | 68 | 90 | 108 | 135 |
| 2 cu yd | 54 | 90 | 120 | 144 | 180 |
| 3 cu yd | 81 | 135 | 180 | 216 | 270 |
Bags = cubic feet ÷ yield, rounded up. Add your waste to the volume before reading the row, or use the calculator, which does it for you.
Half a yard is where the odd numbers start: 13.5 cubic feet is 22.5 bags of 80 lb, so you buy 23, and a quarter yard is 11.25, so 12. Past a yard the table is mostly there so you can see what 135 bags of 80 lb looks like next to a 3 cubic yard truck ticket, which is the point the bags or ready-mix section makes with a scale. Converting the other way, from a plan volume in yards to a bag count or from square feet to yards, is the concrete yards calculator and the walkthrough in how to estimate concrete in cubic yards; the generic how-much-concrete question for any shape is the concrete calculator.
How many bags of concrete on a pallet, and is a pallet a yard?
A pallet of 80 lb standard mix is 42 bags and a pallet of 60 lb is 56, the two counts that show up consistently on retailer and supplier listings; both are 3,360 lb of dry mix and both make 25.2 cubic feet of concrete. That is 0.93 of a cubic yard, not a yard. The rule of thumb that one pallet is about a yard is 7 percent short, three bags of 80 lb, which on a job that needs the whole yard is the trip back to the store. The default 10 × 10 × 4 in slab with waste needs 62 bags: a pallet and 20 more.
| Bag | Bags per pallet | Mix on the pallet, lb | Concrete, cu ft | Cubic yards |
|---|---|---|---|---|
| 80 lb | 42 (verified on retailer and supplier listings) | 3,360 | 25.2 | 0.93 |
| 60 lb | 56 (verified on the same listings) | 3,360 | 25.2 | 0.93 |
| 50 lb | Varies by product; 42 to 64 seen | 2,100 to 3,200 | 15.8 to 24 | 0.58 to 0.89 |
| 40 lb | Often listed as 80; confirm on the quote | 3,200 | 24 | 0.89 |
Pallet counts are packaging, not a rule: the same weight bag of a different product ships 42, 56 or 64 to a pallet. Count the bags on the quotation, then multiply by the yield.
Buying by the pallet changes nothing in the arithmetic. Work out the bags from the volume as above, then divide by the pallet count to see how many pallets and how many loose bags, and remember that a pallet is 42 lifts of 80 lb, and every bag is lifted at least twice. For a job past one pallet the ready-mix comparison below is worth reading before the order goes in.
Bags of concrete for common slabs, pads and piers, all four bag sizes
The slab table runs the sizes people actually pour from bags, at 4 in thick with the tool's 10 percent waste, in all four bag sizes; past 12 × 16 ft the count is over 2½ cubic yards and 118 bags, and a truck is the normal answer. The pier table is the round mode: a solid cylinder with nothing subtracted, which is right for a pier or a tube footing poured without a post in it.
| Slab at 4 in | Cu yd with waste | 80 lb | 60 lb | 50 lb | 40 lb |
|---|---|---|---|---|---|
| 3 × 3 ft | 0.12 | 6 | 8 | 9 | 11 |
| 4 × 4 ft | 0.22 | 10 | 14 | 16 | 20 |
| 5 × 5 ft | 0.34 | 16 | 21 | 25 | 31 |
| 6 × 8 ft | 0.65 | 30 | 40 | 47 | 59 |
| 8 × 8 ft | 0.87 | 40 | 53 | 63 | 79 |
| 8 × 10 ft | 1.09 | 49 | 66 | 79 | 98 |
| 10 × 10 ft | 1.36 | 62 | 82 | 98 | 123 |
| 10 × 12 ft | 1.63 | 74 | 98 | 118 | 147 |
| 12 × 12 ft | 1.96 | 88 | 118 | 141 | 176 |
| 12 × 16 ft | 2.61 | 118 | 157 | 188 | 235 |
Cu yd with waste = length × width × 4 ÷ 324 × 1.1. A 6 in slab is about 1.5 times every count and 5 in about 1.25 times; run the exact size in the calculator.
| Pier, solid | Cu ft, no waste | 80 lb | 60 lb | 50 lb |
|---|---|---|---|---|
| 8 in × 2 ft | 0.7 | 2 | 2 | 3 |
| 8 in × 3 ft | 1.05 | 2 | 3 | 4 |
| 10 in × 3 ft | 1.64 | 3 | 4 | 5 |
| 12 in × 3 ft | 2.36 | 5 | 6 | 7 |
| 12 in × 4 ft | 3.14 | 6 | 8 | 10 |
| 16 in × 4 ft | 5.59 | 11 | 14 | 17 |
| 18 in × 4 ft | 7.07 | 13 | 18 | 21 |
Cu ft = π × (diameter in inches ÷ 24)² × depth in feet. The 12 in × 3 ft row is the calculator's round-mode default.
A fence post changes the second table, because the post takes up part of the hole: a 4×4 in a 10 in hole 2 ft deep displaces about a sixth of the concrete, so the count is lower, and the depth itself comes from frost and fence height rather than a table here. The post hole concrete calculator subtracts the post, concrete for footings and posts works the common post sizes, and fence post spacing and depth covers the hole before the concrete goes in it; the fence calculator counts the posts. For a deck pier the diameter is not a guess either: the deck footing size calculator sizes it from the load and the soil. The 10 × 10 slab is answered in full on the concrete calculator, the 12 × 12 on the concrete slab calculator, and the job-by-job list, steps, mailbox posts, a mower pad, is how many bags of concrete do I need.
Five ways a bag count goes wrong, and the arithmetic that fixes each
Every wrong bag count we have seen quoted, in calculators, on forums and in a manufacturer's own comment replies, is one of five errors, and every one of them is caught by doing the division once, in the right units, on paper.
- Rounding down. 36.67 ÷ 0.60 is 61.1 bags. One published calculator prints 61 for this slab; the tenth of a bag is a real hole in the corner, so the count is 62. Bags are never fractions and never rounded to the nearest; the calculator rounds up, once, at the end.
- Adding the waste twice. The 62 already has 10 percent in it. Adding another 10 percent on top gives 69, seven bags that go back to the store or sit in the garage until they harden. If your volume came from a calculator with a waste field, set this one to 0.
- Inches read as feet. A 24 × 24 × 24 in pier is 2 × 2 × 2 ft = 8 cubic feet, 14 bags of 80 lb, 15 with waste. Typed as feet it is 13,824 cubic feet and 23,040 bags, and that figure has been given to a homeowner as a straight answer. Any count in the thousands for a pier is a unit error.
- A pallet is a yard. It is 0.93 of one. A job that needs exactly a yard in the ground needs 45 bags of 80 lb, three more than the pallet, and 50 with waste.
- Rounding 4 in to 0.33 ft. On a 24 × 24 slab that is 7.04 cubic yards instead of 7.11, and 317 bags of 80 lb instead of 320. Keep the fraction, or use inches and divide by 324 for yards.
| Mistake | Wrong count | Right count |
|---|---|---|
| Rounding down | 36.67 ÷ 0.60 = 61.1, printed as 61 | 62 |
| Waste added twice | 62 bags × 1.1 = 69 | 62; the count already carries it |
| Inches read as feet | 24 × 24 × 24 pier as feet = 13,824 cu ft = 23,040 bags | 8 cu ft, 14 bags, 15 with waste |
| A pallet is a yard | 42 bags treated as 27 cu ft | 25.2 cu ft, 0.93 cu yd; a yard is 45 |
| 0.33 ft for 4 in | 24 × 24 × 0.33 ÷ 27 = 7.04 cu yd, 317 bags | 7.11 cu yd, 320 bags |
The 0.6 bags per square foot shortcut, derived
A manufacturer's estimating post gives a shortcut for a 4 in slab: square feet times 0.6 is the number of 80 lb bags, times 0.8 for 60 lb, times 1 for 50 lb, waste included. It works, and here is why. A square foot of 4 in slab is a third of a cubic foot; a third divided by 0.60 is 0.556 bags, and 0.6 is that with 8 percent on top. The 60 lb version is 0.741, rounded to 0.8 for an 8 percent margin; the 50 lb version is 0.889, rounded to 1 for 12 percent. Three things to know before using it: the margin is not exactly 10 percent, it changes with the bag size, and it only holds at 4 in. At 6 in the factors are 0.9, 1.2 and 1.5; at any other thickness use the calculator.
Bags or ready-mix? The calculator's one-yard line, in numbers
When the waste-inclusive volume reaches a cubic yard the result card adds a line: past about 1 cubic yard, 45 bags of 80 lb, ready-mix delivery is usually the easier option. That is a labour number, not a rule. A yard of concrete from bags is 3,600 lb of dry mix lifted off the shelf, into the truck, out of the truck and into the mixer, then 34 gallons of water and 45 bags through the mixer. The default 10 × 10 slab is 62 bags and sits right at that line; the 12 × 16 slab in the table above is 118 bags and well past it. A truck is ordered in quarter-yard steps, and plants commonly set a minimum load and a short-load charge, which is why nobody sends one for an air-conditioner pad that needs 6 bags or a fence post that needs two; ask your plant what its minimum is.
This site prints quantities only, so the crossover here is stated in volume and lifts, not money. The concrete yards calculator rounds the order to the quarter yard and handles the short-load question; bagged concrete vs ready-mix sets out the break-even by volume and labour, including the middle ground of a towable mixer and pallet delivery. Either way, run the bag count first: the volume is the same number in both, and the count is the one figure a plant cannot give you.
The one code figure the calculator checks: IRC 2021 R506.1
Floors shall be a minimum 3-1/2 inches (89 mm) thick (for expansive soils, see Section R403.1.8). That is the sentence behind the only warning in this tool, from R506.1 on page 5-28 of the Chapter 5 PDF of the 2021 Seattle Residential Code, which reprints the IRC text without local amendment on that page. The word is floors: it governs a slab that is the floor of a house, a basement or a garage. It says nothing about a patio, a walkway, a step tread or a 2 in topping, which is why the calculator prints the count for a thin slab and only warns.
Bags do not change any other code figure, but two of them decide the volume you type in. A footing under a wall is a minimum of 12 in wide and 6 in thick, R403.1.1, and its bottom sits below the frost line by R403.1.4; both are read from Table R403.1 and the local frost depth on the concrete footing calculator, with the full R403 and R506 text in concrete footing and slab code, pages 4-3 and 4-11 of the Chapter 4 PDF. Nothing in the residential code sets a depth for a fence post or a yield for a bag; those are the fence and the label respectively.
Which concrete calculator do you need?
Every concrete tool on this site divides the same volume by the same four yields; each one adds the input its job turns on. Use this page when the question is how many bags to buy; move across when the question is the shape, the thickness, the footing or the truck.
| Job | Use | What it adds |
|---|---|---|
| Bags first, any shape | This page | Bag count with waste, three modes, quantity, four sizes |
| Mixed shapes, steps, curb, round pad | Concrete calculator | Cubic yards for eight shapes, with bags as a secondary row |
| Slab thickness, base, joints | Concrete slab calculator | Thickness by use, ready-mix order line, joint spacing |
| Truck order, short loads | Concrete yards calculator | Quarter-yard rounding, square feet to yards |
| Footing under a wall or pier | Concrete footing calculator | Width by soil from Table R403.1, frost depth, trench volume |
| Post in the hole | Post hole concrete calculator | Subtracts the post from the hole; bags per hole |
| Stone under the slab | Gravel calculator | Base volume in tons, compaction |
| Rebar or mesh count | Rebar calculator | Bar count for a slab grid |
| Pier diameter for a deck | Deck footing size calculator | Footing size from load and soil bearing |
| Driveway, patio, sidewalk, shed pad | Driveway, patio, sidewalk, shed base | Thickness by use, fall, panel layout |
| All of them | Concrete calculators hub | Every concrete tool on the site in one place |
Bags of concrete questions from job sites and forums
How many 80 lb bags of concrete are in a yard?
Forty-five. A cubic yard is 27 cubic feet and an 80 lb bag of standard mix yields 0.60 cubic feet, so 27 ÷ 0.60 = 45 exactly. The same yard is 60 bags of 60 lb, 72 of 50 lb or 90 of 40 lb, because every size is 133 lb of dry mix per cubic foot and 3,600 lb per yard. Those are bags of concrete in the ground; with the calculator's 10 percent waste a yard of purchase is 50, 66, 80 or 99 bags. A pallet of 42 does not reach a yard.
How many bags of concrete do I need?
Cubic feet of the pour, plus waste, divided by the yield on the bag and rounded up; the calculator above does it for a slab, a round pier or a typed volume in all four bag sizes. The job-by-job answers, fence posts, steps, mailbox, mower pad, are in how many bags of concrete do I need.
How much concrete does an 80 lb bag make?
About 0.60 cubic feet, which is 0.022 cubic yards, or a patch 1.8 sq ft at 4 in thick, 3.6 sq ft at 2 in, 1.2 sq ft at 6 in. The figure is the yield printed on a standard concrete mix bag and it is what this calculator divides by; a 60 lb bag makes 0.45, a 50 lb 0.375, a 40 lb 0.30. Fast-setting and high-strength blends list their own, usually close but not identical, so read the bag when the count is tight. The 80 lb bag wants roughly 3 quarts of water to start.
How many bags of concrete for a 10x10 slab?
62 bags of 80 lb at 4 in with 10 percent waste, or 56 without, and 82, 98 or 123 at 60, 50 and 40 lb; the full answer by thickness is on the concrete calculator.
How many bags of concrete are on a pallet?
Forty-two bags of 80 lb or 56 bags of 60 lb for standard concrete mix, the counts retailer and supplier listings agree on; each pallet is 3,360 lb of dry mix and makes 25.2 cubic feet of concrete. Forty-pound bags are usually listed at 80 to a pallet and 50 lb bags anywhere from 42 to 64, depending on the product, so those two are worth confirming on the quotation. Pallet counts are packaging, not a standard: a crack-resistant or high-strength product in the same bag weight can ship a different count.
Is a pallet of concrete one cubic yard?
No. Forty-two bags of 80 lb make 42 × 0.60 = 25.2 cubic feet, which is 0.93 of a cubic yard; a yard needs 45 bags, three more. The pallet-equals-a-yard rule of thumb comes from a manufacturer's estimating post and is fine for a first guess, but on a pour sized at exactly a yard it leaves you three bags short, and with the 10 percent waste the tool applies, eight short. The default 10 × 10 slab here needs 62 bags: one pallet plus 20 loose.
How many bags of concrete per fence post?
Usually one to four bags of 80 lb for a 4×4 in an 8 to 12 in hole 2 to 3 ft deep, but the honest count subtracts the post from the hole and depends on the frost depth; the post hole concrete calculator does both.
Do I add 10 percent waste before or after counting bags?
Before, and once. Add the waste to the volume in cubic feet, then divide by the yield and round up. Adding it after gives the same bag count a second margin, so 62 becomes 69 on a 10 × 10 slab, and rounding twice can add one more. The calculator applies the percentage to the volume in every mode, including when you type a volume in, so if that volume already includes a margin from another tool, set the waste here to 0. The 10 percent covers spillage, a slightly low subgrade and the concrete left in the mixer, not compaction; concrete does not compact like gravel.
Why does the calculator round up to a whole bag?
Because a part of a bag has to be bought as a bag. The default slab is 36.67 cubic feet with waste, and 36.67 ÷ 0.60 = 61.1 bags; the 0.1 is 0.06 cubic feet, a corner of the form that would otherwise be short. The tool rounds up at the very end, on the total, never per row, and when you set a quantity above one it rounds the total once and the per-shape figure separately, so the two can disagree by a bag or two. Any calculator that prints a decimal bag count, or rounds to the nearest, is leaving that corner to you.
Does a 50 lb bag yield less than a 60 lb bag?
Yes, by the same ratio as the weight: 0.375 cubic feet against 0.45, so a yard is 72 bags of 50 lb against 60 bags of 60 lb. People mix the two up because fast-setting mix is commonly sold in 50 lb bags and standard mix in 60, and the two products are used for different jobs; a fast-setting bag lists its own yield, so the bag is the reference. On a pier that needs 5 bags of 80 lb, the 50 lb count is 7 and the 60 lb count is 6, from the table under the result.
How many bags of concrete for a 12 in sonotube 3 ft deep?
Five bags of 80 lb with 10 percent waste, or 6 of 60 lb, 7 of 50 lb, 9 of 40 lb. The tube is 12 in across, so the radius is 6 in and the volume is π × 0.5² × 3 = 2.36 cubic feet, 2.59 with waste, 4.3 bags rounded up to 5. That is a solid tube with nothing in it; if a post or a saddle sits in the wet concrete the count barely moves, but a post that runs the full depth changes it, and the post hole calculator subtracts it. A 4 ft tube of the same size is 6 bags.
How many bags of concrete for a 24x24x24 in pier?
Fourteen bags of 80 lb, 15 with 10 percent waste. Twenty-four inches is 2 ft, so the pier is 2 × 2 × 2 = 8 cubic feet, and 8 ÷ 0.60 = 13.3, rounded up to 14; with waste, 8.8 ÷ 0.60 = 14.7, so 15. The same numbers typed as feet give 13,824 cubic feet and 23,040 bags, which is what one published reply to this exact question said. Any pier count in the thousands is a unit error. Enter the pier in the calculator as a rectangle, 2 ft by 2 ft by 24 in, and it prints 15.
How much water does an 80 lb bag of concrete need?
About 3 quarts to start for standard mix, then more as needed up to roughly 4½, until the mix is stiff and workable with no dry pockets; a 60 lb bag starts near 2 quarts and a 40 lb near 1½. Those are label figures and the bag is the reference. Multiplied out, a yard of 80 lb bags is about 34 gallons carried to the mixer, which is part of the case for a truck past one yard. Too much water is the common mistake and it lowers strength; the ratio and what it does are in concrete mix ratios, water and PSI.
What is the 0.6 bags per square foot rule?
A shortcut for a 4 in slab: square feet times 0.6 gives the 80 lb bags, waste included; times 0.8 for 60 lb; times 1 for 50 lb. A square foot at 4 in is a third of a cubic foot, and a third divided by 0.60 is 0.556 bags, so the 0.6 carries an 8 percent margin; the 60 lb factor is really 0.741 with 8 percent, and the 50 lb factor 0.889 with 12 percent. It is a fair check on a delivery, but it only holds at 4 in and the margin changes by bag size; at 6 in the factors are 0.9, 1.2 and 1.5.
When should I switch from bags to ready-mix?
Around one cubic yard, which is where the calculator adds its note: a yard is 45 bags of 80 lb, 3,600 lb lifted four times and 45 bags through the mixer, and past that most people order a truck. Under half a yard, an equipment pad or a run of post holes, bags win because a plant will not send a truck for it or will charge a short-load fee. Between the two it depends on your mixer, your help and the delivery window; the break-even by volume and labour is in bagged concrete vs ready-mix.
How many bags of concrete make a cubic foot?
Two bags of 80 lb, because one makes 0.60 cubic feet and 1 ÷ 0.60 = 1.67, rounded up. Three bags of 60 lb (1 ÷ 0.45 = 2.2), three of 50 lb (2.7) or four of 40 lb (3.3). The rounding is unkind at this scale, which is why small jobs are better counted from the exact volume: a 12 in tube 3 ft deep is 2.36 cubic feet and needs 5 bags of 80 lb with waste, not the 6 you would get by rounding each cubic foot up on its own. Type the shape into the calculator and it rounds once.
Source and verification of these bag figures
Every bag count on this page is volume divided by yield, rounded up once, regenerated from the same formula the calculator runs and checked by script against the copy before publishing; if a number here disagrees with the tool, the tool is right and the page has a typo. Yields, water amounts and bags per yard are the label values for standard concrete mix. Pallet counts are read from current retailer and supplier listings for the 80 and 60 lb sizes and are labelled as varying for 50 and 40 lb. The one code sentence is IRC 2021 R506.1, page 5-28 of the Chapter 5 PDF of the 2021 Seattle Residential Code, with R403.1.1 and R403.1.4 cited from pages 4-3 and 4-11 of Chapter 4; none carries a local amendment in the line used. How every figure on this site is checked is on the methodology page; who builds it is on the about page.
Built and maintained by Syed Zulqarnain.